A form of cast in situ piling which can be done using temporary or permanent casing to support bore hole. Casing can either be fixed using vibro hammer or rotary method.
Installation of temporary casing guide
Drilling of Pile Borehole
Reinforcement cage installation
Extraction of Temporary Casing Guide
This cast in situ process is suitable for soft ground. It is fast. emits lesser noise and an economical technique of piling.
Continous Flight Auger
Continous Flight Auger
The loading test shall consist of the application of the load placed upon a suitable platform supported by the pile, with suitable apparatus for accurately measuring the test load and the settlement of the pile under each increment of load.
Static Load Test this test is carried out to detemine faults in cast-in-place piles in order to assure that the piles is correctly constructed.
Integrity Test
Integrity Test
Integrity Test
Tension Test
After installation of piles, this test determine the pile capacity soil resistance distribution and settlement characteristics to ensure that the pile undergoes the actual applied load and the settlement will br within the tolerable limits.
Dynamic Test